Skip to main content

// DELIVERY GUARANTEE

ModernGrindTech

Know before you sign.

Pick your scope, pick your deadline, see the actual confidence number. No sales copy on this page. Green means we will guarantee on-time delivery. Red means the calendar says no.

1 day90 days180 days

// RISK ASSESSMENT

Workable with active coordination.

On-time delivery with standard SLA. 90 percent confidence.

Delivery confidence90%
Min days
21
Safe days
45

What makes this work

  • 01Weekly checkpoint calls to pressure-test scope
  • 02Scope locked after discovery, 1 revision included
  • 03Back-up deploy slot held the day before deadline

// HOW THE GUARANTEE WORKS

What 98 percent confidence actually means.

Every MGT project gets a target delivery date at kickoff. On green-lane estimates, the date is backed by a refund policy: if we miss it by more than a week for reasons on our end, you get 10 percent back per week missed.

Yellow-lane estimates swap the refund for a rolling scope checkpoint. Every Friday, we demo what is shipped. If scope drifts, deadline moves with it and you see it live.

Red-lane estimates do not get signed. We flag them and rebuild the estimate with you on a scope call, usually by cutting the feature list in half.

Historical on-time rate on green-lane: 94 percent. Yellow-lane: 71 percent. Delayed projects averaged 8 days late, longest was 5 weeks (scope tripled mid-build, client agreed).